◆MINIMISING DOWNTIME SINCE 2002◆6 MOBILE UNITS ACROSS WA◆PRECISION LINE BORING & MACHINING◆AFTERMARKET MINING PARTS◆KEEP YOUR EQUIPMENT MOVING◆MINIMISING DOWNTIME SINCE 2002◆6 MOBILE UNITS ACROSS WA◆PRECISION LINE BORING & MACHINING◆AFTERMARKET MINING PARTS◆KEEP YOUR EQUIPMENT MOVING
Case Study

On-Site Excavator Dipper Line Boring

On-site line boring of dipper stick bores with weld build-up and re-bush.

Service

Mobile Line Boring

Industry

Surface Mining

Equipment

Excavator

Location

Pilbara, WA

On-Site Excavator Dipper Line Boring — image 1

The Problem

An excavator dipper stick had worn and ovalised bucket pin bores, requiring repair without removing the boom for workshop transport.

Scope of Work

On-site line boring of dipper stick bores with weld build-up and re-bush.

The Solution

NLC mobilised a line boring unit to site, set up on the dipper stick, weld built up the worn bores and machined them back to specification, then fitted new bushes.

Our Process

Mobilise, set up, weld build-up, line bore to spec, re-bush, return to service.

The Outcome

Excavator returned to operation on site, avoiding costly transport and extended downtime.

Enquiry

Discuss Your Project

Share your requirement and our engineering team will respond with advice and a quote.

Files are stored privately — no public URL, so access follows your app's permissions.

Get In Touch

Keep Your Equipment Moving

Whether you need an urgent repair, mobile line boring, machining, fabrication, component refurbishment or an aftermarket replacement part — make it easy to engage NLC Engineering.